Chapter 3  
Preparation  
This chapter describes the initial setup and preparation for installing the router.  
This chapter includes the following topics:  
Site Selection  
Tools and Parts Required for Installation  
Electrostatic Discharge (ESD) Precautions  
3.1  
Site Selection  
The following criteria should be considered when selecting a site to install the router:  
Temperature and Ventilation: For proper ventilation, install the router where there is ample airflow  
to the front and back of the router. The ambient temperature should not go below 0° or exceed  
40°C.  
Note: To prevent the router from overheating, do not operate it in an area where the  
ambient temperature exceeds 40°C (104°F).  
Rack Space: Install the router in a rack or cabinet. The router height is 1.74". The accessory kit  
provides necessary equipment such as mounting brackets and screws required for the installation.  
When mounting the router in a partially filled rack, load the rack from bottom to top, with the  
heaviest equipment at the bottom. Load the router at the bottom if it is the only item in the rack.  
Power Requirements: Power requirements vary by router and power supply model. Refer to Table  
3: Power Ratings and for information regarding your specific system.  
Note: The power input plug-socket combination must be accessible at all times; it provides  
the primary method of disconnecting power from the system.  
Other Requirements: Select a site where liquids or objects cannot fall onto the equipment and  
foreign objects are not drawn into the ventilation holes. Verify the following guidelines are met:  
Clearance areas to the front and rear panels allow for unrestricted cabling.  
All front and rear panel indicators can be easily read.  
Power cords can reach from the power outlet to the connector on the rear panel.  
Note: All power connections must be removed to de-energize the unit.  
3.2  
Tools and Parts Required for Installation  
Each router provides an accessory kit that contains parts that are required to install the router. In  
addition to the accessory kit, the following tools and equipment are required to install the router:  
Additional Tools  
Screwdriver  
Screws or rack mounting nuts and bolts  
5
GeneralDetails
NameARISTA AWE-5510 Wifi Router User Guide
MakeARISTA
LanguageEnglish
FiletypePDF (Download)
File size0.33 MB
Download PDF
1 Star2 Stars3 Stars4 Stars5 Stars (1 votes, average: 5.00 out of 5)
Loading...

If you have any questions regarding ARISTA AWE-5510 Wifi Router User Guide, please ask here and describe the problem in detail.

Leave a Reply

Your email address will not be published. Required fields are marked *

3 × 5 =

ARISTA 7220R Series Enterprise WAN Router Instruction Manual
ARISTA 7220R Series Enterprise WAN Router Instruction Manual

ARISTA AWE-5510 Wifi Router User Guide