UfiSpace S9600-64X 100G Aggregation Router Installation Guide

7 Installing Power Supply Units  
The power supply unit (PSU) is a hot swappable field replaceable unit (FRU) and can be replaced  
while the router is operating as long as the remaining (second) PSU is installed and in operation.  
The AC and DC PSU follow the same steps for installation. The PSU comes preinstalled and the  
following are instructions on how to install a new PSU.  
Safety Notices  
Caution! Shock hazard!  
TO DISCONNECT POWER, REMOVE ALL POWER CORDS FROM UNIT.  
DC:  
AC:  
Figure 16.  
1. Locate the red release tab on the PSU. Then press and hold down the release tab to unlock the  
PSU.  
2. While holding down the red release tab, grip the PSU's handle and firmly pull it out of the  
power bay.  
DC Version:  
AC Version:  
Figure 17.  
S960064X Hardware Installation Guide | 14  
GeneralDetails
NameUfiSpace S9600-64X 100G Aggregation Router Installation Guide
MakeUfiSpace
LanguageEnglish
FiletypePDF (Download)
File size0.8 MB
Download PDF
1 Star2 Stars3 Stars4 Stars5 Stars (1 votes, average: 5.00 out of 5)
Loading...

If you have any questions regarding UfiSpace S9600-64X 100G Aggregation Router Installation Guide, please ask here and describe the problem in detail.

Leave a Reply

Your email address will not be published. Required fields are marked *

two × 5 =

UfiSpace S9500-30XS Gateway Router Installation Guide
UfiSpace S9500-30XS Gateway Router Installation Guide
ufiSpace S9600-72XC Router Installation Guide
ufiSpace S9600-72XC Router Installation Guide
UfiSpace S9600-32X 100G Aggregation Router Installation Guide
UfiSpace S9600-32X 100G Aggregation Router Installation Guide
UfiSpace S9501-28SMT Gateway Router Installation Guide
UfiSpace S9501-28SMT Gateway Router Installation Guide

UfiSpace S9600-64X 100G Aggregation Router Installation Guide