Home > UfiSpace > UfiSpace S9600-64X 100G Aggregation Router Installation Guide

UfiSpace S9600-64X 100G Aggregation Router Installation Guide

Figure 3.  
Preparation Check List  
Task  
Check  
Date  
Power voltage and electric current requirements  
DC version: 40 to 72V DC, 50A maximum x2 or;  
AC version: 200 to 240V AC, 10A maximum x2  
Installation space requirements  
S960064X requires 2RU (3.45”/8.8cm) in height, 19” (48.3cm) in  
width, and need a minimum reserve depth of 36 inches (91.4cm)  
Thermal requirements  
S960064X working temperature is 0 to 45°C (32°F to 113°F), airflow  
direction is fronttoback  
Installation tools required  
#2 Philips Screwdriver, 6AWG yellowandgreen wire stripper, and  
crimping tool  
Accessories required  
PC with USB ports and terminal emulation software  
S960064X Hardware Installation Guide | 4  
GeneralDetails
NameUfiSpace S9600-64X 100G Aggregation Router Installation Guide
MakeUfiSpace
LanguageEnglish
FiletypePDF (Download)
File size0.8 MB
Download PDF
1 Star2 Stars3 Stars4 Stars5 Stars (1 votes, average: 5.00 out of 5)
Loading...

If you have any questions regarding UfiSpace S9600-64X 100G Aggregation Router Installation Guide, please ask here and describe the problem in detail.

Leave a Reply

Your email address will not be published. Required fields are marked *

5 + six =

UfiSpace S9500-30XS Gateway Router Installation Guide
UfiSpace S9500-30XS Gateway Router Installation Guide
ufiSpace S9600-72XC Router Installation Guide
ufiSpace S9600-72XC Router Installation Guide
UfiSpace S9600-32X 100G Aggregation Router Installation Guide
UfiSpace S9600-32X 100G Aggregation Router Installation Guide
UfiSpace S9501-28SMT Gateway Router Installation Guide
UfiSpace S9501-28SMT Gateway Router Installation Guide

UfiSpace S9600-64X 100G Aggregation Router Installation Guide