CNC3D QB2 CNC Router User Guide
3.Checking connectors
Before doing any maintenance involving wires including checking
connections and screw terminals, make sure to POWER OFF the machine.
Not doing so risks causing irreparable damage to the Nighthawk Controller!
Check every green connector and its screw terminals with a small flat head
screwdriver and ensure they are tight and secure. Give each individual wire a firm tug
to ensure they will not pull out of the connector.
QB2 Page 22
QB2 User and Maintenance Guide – Revised 28/09/2022
| General | Details |
|---|---|
| Name | CNC3D QB2 CNC Router User Guide |
| Make | CNC3D |
| Language | English |
| Filetype | PDF (Download) |
| File size | 1.11 MB |
If you have any questions regarding CNC3D QB2 CNC Router User Guide, please ask here and describe the problem in detail.






































