UfiSpace S9501-28SMT Gateway Router Installation Guide
4. Feed DC power into the system.
The PSU will immediately output 12V and 5VSB to the system when a ‐36V to ‐75V DC power
source is applied. The PSU has a built in 20 amperes, fast acting fuse based on the PSU
maximum capacity, which will act as a second tier system protection in case the power
distribution unit’s fuse is not functioning.
5. Verify that the power supply is operating.
If connected correctly, when turned on, the LED on the PSU will light up with a Green color
designating normal operation.
AC Version
1. Ensure there is enough power to supply the system.
The maximum system power consumption is 96.9 watts with an input voltage of 100‐240V AC.
It is recommended to ensure that enough power is reserved from the power distribution
system before installation. Also, please ensure that both PSUs have been properly installed
before powering up the equipment, as the S9501‐28SMT is designed to support 1 + 1 power
redundancy.
2. Attach the power cable.
Plug the power cord into the AC PSU and secure it tightly.
3. Verify that the power supply is operating.
If connected correctly, when turned on, the LED on the PSU will light up with a Green color
designating normal operation.
Figure 25.
S9501‐28SMT Hardware Installation Guide | 17
| General | Details |
|---|---|
| Name | UfiSpace S9501-28SMT Gateway Router Installation Guide |
| Make | UfiSpace |
| Language | English |
| Filetype | PDF (Download) |
| File size | 0.77 MB |
If you have any questions regarding UfiSpace S9501-28SMT Gateway Router Installation Guide, please ask here and describe the problem in detail.

UfiSpace S9500-30XS Gateway Router Installation Guide

ufiSpace S9600-72XC Router Installation Guide

UfiSpace S9600-64X 100G Aggregation Router Installation Guide

UfiSpace S9600-32X 100G Aggregation Router Installation Guide












































