2.5 Move the heat shrink tubing to cover any exposed metal on the DC power cable and lug.  
Figure 23.  
2.6 Use a heat source to secure the heat shrink tubing in place. Allow the heat shrink tubing  
to cool before attaching the DC power cable. An example of the installed DC version with  
insulation material as below.  
Figure 24.  
3. Attach the power cable.  
Locate the DC power screwtype terminal block located on the PSU. Remove the plastic cover  
that is protecting the terminal block by pushing from the top or bottom of the cover and  
flipping open the cover outwards. Secure the oneholed lugs (with the DC power cable  
S960072XC Hardware Installation Guide | 19  
GeneralDetails
NameufiSpace S9600-72XC Router Installation Guide
MakeUfiSpace
LanguageEnglish
FiletypePDF (Download)
File size0.84 MB
Download PDF
1 Star2 Stars3 Stars4 Stars5 Stars (1 votes, average: 5.00 out of 5)
Loading...

If you have any questions regarding ufiSpace S9600-72XC Router Installation Guide, please ask here and describe the problem in detail.

Leave a Reply

Your email address will not be published. Required fields are marked *

three × two =

UfiSpace S9500-30XS Gateway Router Installation Guide
UfiSpace S9500-30XS Gateway Router Installation Guide
UfiSpace S9600-32X 100G Aggregation Router Installation Guide
UfiSpace S9600-32X 100G Aggregation Router Installation Guide
UfiSpace S9600-64X 100G Aggregation Router Installation Guide
UfiSpace S9600-64X 100G Aggregation Router Installation Guide
UfiSpace S9501-28SMT Gateway Router Installation Guide
UfiSpace S9501-28SMT Gateway Router Installation Guide

ufiSpace S9600-72XC Router Installation Guide